Team Meeting Record

➡️Presentation final inspection schedule -February 5th 12:00-12:30, Mock presentation at Geomam Station (final inspection of letter spacing, length, etc.) -After the meeting, take a taxi and go to the site.

➡️Assignments and due dates *The script should be short and clear so that it can be presented as concisely and slowly as possible.

Jiyon: -Write a presentation script for the amount in charge and share the situation in the chat room (by the morning of February 5th) -After creating slide visualization materials, leave blank if necessary (until the morning of February 3)

Hanna: -Write a presentation script for the amount in charge and share the situation in the chat room (by the morning of February 5th) -Fill in the blank sections of the slide with key content (until the morning of February 5th)

KyungHun: -Write a presentation script for the amount in charge and share the situation in the chat room (by the morning of February 5th) -Fill in the blank spaces on the slide with key content (add the Wow Factor page at the beginning) (until the morning of February 5th) -Preparing to film a video interview (until midnight on February 19th)

  1. Can you connect me to the Korea Water Resources Management Corporation (K-Water) Focal Point?
  2. Ask if it is okay to mention the World Bank and KGGTF when contacting an external representative of the Drought Information Portal.
  3. When can I receive draft feedback?
  4. How many minutes should I prepare for the presentation on February 6th?
  5. Is it possible to conduct a video interview? -Dr. Jiyeon Shin's email reply shared in chat room (ASAP when reply is received) 6)Share comprehensive interview questions

➡️Link Draft Google Docs: https://docs.google.com/document/d/1S0hgLgLiBzVqMRyCf5ugqDdXSa4ClZQ9s_UUcRZTqjQ/edit?usp=sharing Meeting minutes Google Docs: https://docs.google.com/document/d/1SIpokY32CC1ez1XNh-e1NnmI-7SnlsYwAj82CYYoyH4/edit Team Google Drive: https://drive.google.com/drive/folders/1mMC7UJmqa3Z7LZhMtBfuL3umOjfgQrCb?usp=sharing Google Slide: https://docs.google.com/presentation/d/1uN8ev77tON5JmM4Qp801oeP-U-JiZiP46fvFtWEQiKY/edit#slide=id.g2adb6c047af_0_11

➡️ Amount of presentation preparation

Contents Executive Summary

  1. Introduction 1.1. Global Trends in Water Sector 1.2. Green growth as A Key Solution
  2. Green Growth and Water 2.1. Literature Review 2.2. Best Practices of Green Growth in Water Sector

[Hanna] (3-4 minutes) 3. Case Study: Water Security and Drought Resilience in the South of Angola [Hannah] 3.1. Summary of the project [Hannah] 3.3.1. Identify the Priority Areas [Hannah] 3.2. Background and Objective [Hannah] 3.3. Process and Methodology [Hannah] 3.4. Results and Limitations

[KyungHun] (5 minutes) 4. Contribution to Sustainable Development [KyungHun] 4.1. Highlights and Main Characteristics of the Grant project [KyungHun] 4.1.1. Social Pillar [KyungHun] 4.1.2. Environmental Pillar [Jiyon] 4.1.3. Economic Pillar [KyungHun] 4.2. Key Takeaways from ROK’s Development Experience